A practical proposal for Multidimensional Gas Metering

The safety concern is precisely why we are currently working on benchmarks to measure the resource consumptions of each EVM operation. The goal is to make sure that the cost per resource of each operation maps well to the block limit and that the nodes following EIP-7870 specs can still perform their duties on time.

Is there any other analysis that would make sense here in your view?